Completion of road network Ag. Varvara - Apomarma (Sta. 22+170 - Sta. 29+990)

1
  • GROUP COMPANY: J/V ERETBO S.A. - EKTER S.A. - DOMIKI KRITIS S.A.
  • CLIENT: ORGANIZATION FOR THE DEVELOPMENT OF CRETE (ΟΑΚ S.A.) / DIRECTORY OF TRANSPORTATION PROJECTS
  • VALUE (€): 47.000.000,00
  • LOCATION: CRETE
  • START-COMPLETION: 26/10/2016
  • STATUS: Under Construction
  • DESCRIPTION:

    The forseen project works from the start (Sta. 22+170) until the end (Sta. 29+990) consost of the following section:

    1. Excavation B01 (Sta. 22+170 - Sta. 22+635)
    2. Sta. 22+635 - Sta. 23+065
    3. Excavation B04 (Sta. 23+040 - Sta. 24+205)
    4. Tunnel entrance excavation (Sta. 24+200 - Sta. 24+315)
    5. Ag. Varvara tunnel (Sta. 24+315 - Sta. 24+820)
    6. Tunnel exit mouth and Cut & Cover (Sta. 24+820 - Sta. 24+828,74)
    7. Ag. Varvara bridge (Sta. 24+840 - Sta. 25+100)
    8. Excavation B08 (Sta. 25+100 - Sta. 25+300)
    9. Excavation B09 (Sta. 25+300 - Sta. 25+500) - κατασκευή Lane & Cover
    10. Excavation B10 (Sta. 25+500 - Sta. 26+100) - κατασκευασμένο Lane & Cover
    11. Panasos flyover Excavation Β50 (Sta. 26+100 - Sta. 26+700)
    12. Constructed excavation Β13 (Sta. 26+700 - Sta. 27+065)
    13. Constructed ground instability bridge and constructed excavation Β14 (Sta. 27+065 - Sta. 27+540)
    14. Constructed excavation B15 (Sta. 27+540 - Sta. 28+085)
    15. Constructed bridge Apomarma Ι (Sta. 28+085 - Sta. 28+295)
    16. Constructed excavation B28.4 (Sta. 28+295 - Sta. 28+500)
    17. Excavation B40 Gergeris flyover (Sta. 28+500 - Sta. 28+850)
    18. Excavation B40 Gergeris flyover(Sta. 28+850 - Sta. 29+550)
    19. Constructed bridge Apomarma ΙΙ - end of road project (Sta. 29+550 - Sta. 29+999)

    The estimated completion time of the project is 30 months.