- GROUP COMPANY: ERETBO S.A.
- CLIENT: MINISTRY FOR THE ENVIRONMENT, PHYSICAL PLANNING AND PUBLIC WORKS – GENERAL SECRETARIAT OF PUBLIC WORKS – EYDE/ESEA
- VALUE (€): 31.857.775,57
- LOCATION: ATTICA
- START-COMPLETION: 10/09/2002 – 30/06/2004
- STATUS: COMPLETED
- DESCRIPTION:
Renovation and widening of Varis – koropiou avenue, total length 4.250m, from the crossroad with Thermopilon road until the entrance to koropi, with simultaneous crossroads configuration, construction of drainage pipe with total length of 3.050m, of a secondary drainage network, a deck drainage network and A flood control pipe of 2.786m length. Moreover a 340m-length tunnel with a diameter of 3,50m was constructed.