- GROUP COMPANY: ERETBO SA
- CLIENT: ATHENS WATER SUPPLY AND SEWERAGE COMPANY SA
- VALUE (€): 629.707,47
- LOCATION: ATHENS
- START-COMPLETION: 16/12/1998 – 13/05/2004
- STATUS: COMPLETED
- DESCRIPTION:
The project includes all the necessary works for the complete installation of a pipe made of steel Ø300 of 6.060m length and of a pipe made of steel Ø150 of approximately 300m length and the complete construction of the building works on both pump stations at Pentelis Avenue, Athens.

