- GROUP COMPANY: ERETBO SA
- CLIENT: NATIONAL AND KAPODISTRIAN UNIVERSITY OF ATHENS
- VALUE (€): 691.996,28
- LOCATION: ATHENS
- START-COMPLETION: 22/05/1991 – 15/02/1993
- STATUS: COMPLETED
- DESCRIPTION:
Construction of asphalted perimeter road and its drainage networks, surroundings of the Physic mathematic faculty that includes earthworks, underground networks, landscaping walls, curbs, paving, configurations and asphalting parking lots, roads and pavements, drainage channels with grids, flower beds and embankments, lightings outdoor spaces.


