- GROUP COMPANY: JOINT VENTURE ERETBO SA – TOMI SA
- CLIENT: OLYMPIC VILLAGE 2004 S.A.
- VALUE (€): 30.867.814,84
- LOCATION: ATTICA
- START-COMPLETION: 19/08/2003 – 31/07/2007
- STATUS: COMPLETED
- DESCRIPTION:
Completion of surroundings’ configuration of the Olympic Village (building, electromechanical and planting works) for the Olympic and post-Olympic use adjustments, construction of all the necessary infrastructures to accommodate the temporary structures needed for the Olympic Games and removal of the unnecessary ones after the Olympic Games and construction of the necessary works for the completion of the flood protection of the Olympic Village. Specifically, construction of three outdoor parking spaces (593 parking spaces, 292 parking spaces for cars and 36 parking spaces for vans and 201 parking spaces), construction of seven medium voltage substations (20KV /0,4KV), construction of water tank, four irrigation systems for a lake of total area 350m2 and volume of 195m3. Also, construction of underground pipe for the diversion of KONTITA stream at loose soils to semi-rocky soils with the pipe jacking method, length 309m.