- GROUP COMPANY: JOINT VENTURE ERETBO SA – AIAS SA – MECHANOTECHNICA SA
- CLIENT: PUBLIC POWER CORPORATION SA
- VALUE (€): 4.333.823,97
- LOCATION: ARACHTHOS
- START-COMPLETION: 15/09/1999 – 25/01/2002
- STATUS: COMPLETED
- DESCRIPTION:
Construction of special buildings for Arachthos conversion station for the interconnection between Greece and Italy.

