REUSE OF THE TSALAPATA POTTERY (PHASE 2)

1
  • GROUP COMPANY: ERETBO S.A
  • CLIENT: MUNICIPALITY OF VOLOS
  • VALUE (€): 1.088.256,98
  • LOCATION: VOLOS
  • START-COMPLETION: 07/05/1998 – 30/11/2001
  • STATUS: COMPLETED
  • DESCRIPTION:

    Fixation, maintenance and reconstruction of the preserved buildings of the old rooftile and brickworks factory of Tsalapata in Volos. The project included works of shotcrete, reinforcement of load bearing structures with steel constructions, old walls and floors restoration, old machine servicing with sandblasting and repainting, masonry water sandblasting to convert the uses of old buildings with integration of new functions such as restaurant, shops, cinema, library etc.